Case(1) Rotary Ash Coolers for NARVA 2×300MW CFB Project, Estonia


Location:
In the district of Vaivara, the north east of Estonia near the border with Leningrad Oblast, Russia and the Baltic sea.

Features:
Project: Narva 2x300MW CFB project, Estonia
Owner: Narva Elektrijaamad AS, Estonia
EPC Contractor: Alstom (France)
Purchaser: Alstom Estonia AS
Fuel: Oil Shale
PO Effective Date: March, 2012
Scope of Supply: 6 x 21 ton/hr Rotary Ash Coolers for each Unit
Delivery Date: February, 2013
Delivery Terms: Ex-Works of Songling’s Shop

Design and Fabrication Code:
ASME VIII, and in compliance with the following EC directives:
- Machine Directive 2006/42/EC
- Pressure Equipment Directive 97/23/EC
- Low Voltage Directive 2006/95/EC
- Electromagnetic Compatibility Directive 2004/108/EC

CE Certificates:

 

 

Case(2) Ash Handling System for STANARI 1×300MW CFB Project, Bosnia and Herzegovina

" />


Location:
Near the Stanari lignite mine, Bosnia and Herzegovina.

Features:
Project: STANARI 1x300MW CFB Power Plant, Bosnia and Herzegovina.
EPC Contractor: Dongfang Electric
Fuel: lignite
PO Effective Date: March, 2012
Scope of Supply: Rotary Ash Coolers,Bucket Conveyor,Bucket Elevator,Bottom Ash Silo,Fly Ash Silo,Bottom Powder Silo,Bed Material Silo
Delivery Date: April, 2014

Design and Fabrication Code:
ASME, and in compliance with the following EC directives:
- Machine Directive 2006/42/EC
- Pressure Equipment Directive 97/23/EC
- Low Voltage Directive 2006/95/EC
- Electromagnetic Compatibility Directive 2004/108/EC

 

 

Case (3): 10x135MW, for Jindal Steel & Power (SBW boiler), India

   

Features

  • 10×135MW boilers supplied by SBW.
  • 4×25t/h Ling rotating ash coolers for each boiler in 01/2009.
  • Ash system including ash cooler,bucket conveyor and ash silo.
  • Cooling water: DM water.
  • Design pressure: 1.2Mpa.
  • Ash outlet temperature: <150℃.
 

Location

Harghoda, District Raigarh, India

 

 

Case (4): Adani Power Station Phase III 5×660MW, India

   

Features

  • 5×660MW Boliers, Supplied by HBW.
  • 1 SFC for per boiler.
  • Delivered in 06/2008.
  • Auxiliary equipment including ash hopper,  Cut off gate, ash silo.
  • Hydraulic motor drive, SFC attach to silo directly.
 

Location

Aatmajyoti housing society, Navkar Apartment, Plot No.11, S.R.NO, 206/3 Mundra, Baroi Road, Mundra-Kutch-370421 Guiarat India

 

 

Case (5): Shenhua Shendong Guojiawan Power Plant 2x300MW

   

Features

  • 2×300MW CFB boilers supplied by HBW.
  • Complete line of ash handling system from cooler to silo supplied by SEEC.
  • Descriptions: ash from boiler sidewall, 6 coolers for per boiler, 3 ash conveying line and 1silo for per boiler, each line including 1 chain bucket conveyor and 1 bucket elevator.
 

Location

Fugu county, Shanxi

 

 

Case (6): Suancigou Power Plant 2x300MW

   

Features

  • 2×300MW Unit, 2×1025t/h CFB boilers supplied by DBW.
  • Complete line of ash handling system from cooler to silo unloading system supplied by SEEC.
  • Descriptions: ash from boiler front wall, 6 coolers for per boiler, 1 ash conveying line working and 1 ash conveying line standby, and 1 silo for per boiler, each line including 1 chain bucket conveyor and 1 bucket elevator. Silo furnished with 2 wet ash unloading systems.
 

Location

Zhunger county, Neimongol